Tendi — Your Bidding Winner

BID COORDINATION

Tender Clarification Log: Keep Changes and Follow-Up Organized

A clarification answer can affect several parts of a proposal. If the answer stays in one person’s inbox, the technical response may change while the pricing assumptions or submission checklist remain untouched. A shared clarification log gives each change an owner and a traceable resolution.

Use the buyer’s stated rules to determine when questions are allowed, how to ask them and which communications form part of the tender. The log helps your team follow that process; it does not create permission to contact the buyer outside it.

Keep the log with your controlled bid documents

Choose one shared location for the tender documents, amendments and clarification record. Assign a coordinator to maintain the current version. Give contributors access appropriate to their role and avoid circulating unnecessary copies of confidential material.

Start by recording the notice reference, the document version and the date your team received it. If the buyer issues a new version or amendment, keep the earlier copy as a clearly identified record and tell the team which version now governs its work.

Use a small set of practical fields

  • Reference: a unique number for the question or clarification.
  • Requirement: the clause, schedule or attachment affected.
  • Question: the precise point the team needs resolved.
  • Deadline and channel: the buyer’s stated cutoff and permitted route.
  • Owner: the person responsible for preparing or checking the question.
  • Response: the answer, its source and the date received.
  • Impact: affected response sections, assumptions or commercial items.
  • Status: drafted, submitted, answered, action assigned or closed.

A spreadsheet or controlled project board can work. The useful feature is visibility: someone can see what is open, who owns it and what needs to change before the bid is approved.

Write questions that identify the uncertainty

Refer to the exact requirement and explain the ambiguity concisely. Ask for the information needed to prepare an accurate response. Have a reviewer check the wording before it is sent, particularly if it describes an assumption that could affect price or delivery.

For example, if two attachments appear to specify different support hours, cite both references and ask which requirement applies. Do not silently select the easier interpretation. Record the approved question and any submission confirmation in the log.

Turn each answer into assigned changes

When an answer arrives, identify every affected part of the bid. A revised delivery assumption might change the workplan, staffing description and price schedule. Name an owner for each change and set an internal completion time that leaves room for review.

Close the clarification only after those owners confirm the changes and the coordinator checks the controlled response. An answer received is not the same as an answer implemented. If the response introduces another uncertainty, record it separately and check whether the question process is still open.

Separate pre-submission questions from later follow-up

After submission, retain the final files and receipt. Track any permitted requests for clarification, demonstrations or additional information in a follow-up section. Record the requested response date and the person responsible for the next action.

Follow the buyer’s communication rules. Avoid treating a planned reminder as permission for informal contact, and do not describe a submission receipt as an award or acceptance. The next step should reflect what the buyer actually communicated.

Review open items before the final handover

Before sign-off, review unanswered questions, unresolved assumptions and changes waiting for approval. Make each exception visible to the decision-maker. Keep the final log alongside the submitted version so the team can explain how it handled the requirements.

Tendi provides opportunity research, proposal preparation, submission coordination and human follow-through. Get the free Bid-Ready Checklist for a readiness and handover framework, or tell us about the opportunity you are considering.

This is a practical coordination method. Each tender’s instructions control the process; no checklist guarantees a contract award.