A bid pricing assumptions log records the conditions your team has used to prepare an offer. It connects the proposed price with the scope, volumes, responsibilities and other inputs behind it. Used well, it helps a reviewer see whether the commercial schedule and the written proposal describe the same service.

This guide explains a practical internal coordination method. It does not set your prices or determine which qualifications a buyer will accept. Follow the specific tender instructions and have the appropriate commercial, delivery and specialist owners approve the offer. A completed spreadsheet is a working record, not authority to submit a price.

By Tendi — practical guidance for bid coordination and specialist review.

Pricing assumption record connecting the input and source, affected offer material, responsible owner, next action and approved treatment.
An assumptions log records the offer’s basis; it is not authority to set or submit a price. Open full-size diagram.

Why assumptions need their own working record

Pricing inputs often arrive from several people. A delivery lead estimates effort, a supplier provides a quotation, an account lead describes the customer’s needs and a writer turns that information into a service narrative. Each person may be working from a different understanding of the scope. The differences can remain invisible until the final review.

For example, the price may allow for one training session while the proposal describes training for every user group. The timetable may assume customer data is ready before work starts, while the responsibilities section assigns data preparation to the supplier. These are scope inconsistencies that a clear assumptions record should help the team identify.

APMP’s public Winning Business Ecosystem includes pricing alignment within proposal development and identifies collaboration among pricing, contracts and legal teams during negotiation. The working log below is a suggested internal method for checking that the priced scope, technical approach and assumptions agree; it is not an APMP template.

Distinguish an assumption from a confirmed fact

A confirmed input has a source that the responsible owner considers suitable for this bid. An assumption is a condition used while preparing the offer that still needs to be checked, accepted or disclosed through the appropriate process. Keep those states distinct. A convenient planning estimate should not gradually become a fact because several people repeat it.

Record the basis for the input. It may come from a buyer document, a formal clarification, an approved internal estimate or a current supplier quotation. Preserve the source reference and applicable version. If a person provides an estimate verbally, ask them to confirm what it covers before another contributor relies on it.

Do not describe buyer silence as agreement. If a question remains unanswered, record that state and the decision required. The authorised commercial team must assess how to proceed under the actual tender instructions. The writer should not imply acceptance merely to make the final paragraph read smoothly.

Separate assumptions, exclusions and options

These labels can describe different parts of an offer. An assumption may explain the condition used to estimate work. An exclusion identifies something outside the offered scope. An option describes additional or alternative work when the request permits it. Define the working terms with your commercial owner and use the buyer’s required terminology in the submission.

A row that says “additional integrations excluded” should not be hidden among routine planning assumptions. It may materially affect whether the offer addresses the requested scope. Likewise, an optional service should not appear as included in the main narrative unless it is actually part of the base offer.

Keep the internal record broader than the external disclosure where necessary. Your working log can track questions, rejected approaches and private approval notes. The submitted assumptions or qualifications schedule should contain only the approved content required or permitted by the buyer. Review that external version separately.

Choose columns that support a decision

Begin with a manageable structure. The log should make it easier to resolve an issue, not create a second pricing workbook. Link to the controlled estimate or source rather than copying confidential calculations into every row. Give contributors access appropriate to their role.

  • Reference: a stable internal identifier and the connected buyer requirement.
  • Statement: the exact condition, scope boundary or unresolved input.
  • Basis: the source, version, date and reason the input is being used.
  • Affected material: pricing line, response section, timetable or attachment.
  • Owner: the person responsible for confirming or resolving the issue.
  • Decision needed: the question an authorised reviewer must answer.
  • Status: unconfirmed, under review, approved for use, replaced or another clearly defined state.
  • External treatment: where the approved position will appear, if disclosure is permitted or required.
  • Review record: who approved the position and which offer version was checked.

These are suggested fields. Adapt them to your team and the request. Avoid a status such as “done” that does not explain whether the input was confirmed, qualified or removed. The final reviewer needs to understand the decision, not merely see that somebody edited the row.

Identify the inputs most likely to change the offer

Review the quantities and boundaries underlying the estimate. Depending on the service, relevant inputs might include sites, users, deliverables, sessions, transactions, service periods or travel requirements. The commercial owner should determine which inputs matter. Do not add arbitrary detail that has no connection to the work or price.

Check responsibilities as carefully as quantities. A customer-provided activity can still require supplier coordination. A third-party service may require access arrangements or an additional agreement. Ask the delivery owner to explain how the proposed division of work affects the estimate and timetable.

Look for words in the narrative that expand scope. “All,” “unlimited,” “dedicated,” “immediate” and “comprehensive” can mean more than the estimate allows. Specific language is useful when approved and accurate. Otherwise, replace broad wording with the clear description the business is authorised to offer.

Link each issue to the material it affects

A useful log points to the pricing line and the narrative section that depend on the same input. Add the relevant timetable or responsibility reference where needed. This makes it possible to update the offer coherently when a clarification changes the scope.

For example, an increase in the requested number of sites might affect delivery effort, travel, training and the schedule. A row linked only to the headline price can miss those connected changes. Ask the responsible owners to identify the affected material rather than assuming the pricing lead can determine every operational consequence alone.

Use your RFP compliance matrix to retain the requirement references. The matrix tracks response coverage. The assumptions log explains the inputs and decisions behind the offer. Connect the records where useful without merging them into an unmanageable file.

Fictional training-scope mismatch between an estimate for two remote sessions and broader draft wording, resolved by authorised owners and coordinated updates.
Fictional teaching example, not a Tendi price or a recommendation for a real project. Open full-size diagram.

Worked example: a fictional training scope

Consider a fictional service proposal that includes initial training. The buyer asks for an explanation of user preparation but has not specified the number of participating groups. The delivery estimate currently allows for two remote sessions. This is a teaching example, not a Tendi price or a recommendation for a real project.

The first draft describes “comprehensive training across the organisation.” The assumptions log identifies a mismatch. The statement is broader than the work used in the estimate. The row records the buyer reference, the two-session planning basis, the delivery owner and the response section that needs review.

The team then considers the permitted next steps. It may ask a clarification question through the buyer’s designated channel. It may also need an internal decision about what training scope the business can offer. The writer should not choose the cheapest interpretation independently or assume that the buyer will accept a limitation.

Once the authorised position is established, the team updates the service description, pricing schedule and any required assumptions statement together. The log records the decision and offer version. If a later amendment specifies more groups, the row reopens and the affected owners reassess the offer.

The example shows why the log is useful before the final commercial review. It exposes a real decision while there is still time to resolve it. A polished sentence cannot resolve a difference between what the business has estimated and what the proposal appears to promise.

Give every unresolved input an owner and a next action

Assign responsibility to someone who can coordinate a resolution. That person may need information from a buyer, supplier or internal expert, but the dependency should be explicit. A row marked “waiting” without a named owner can remain unchanged until submission day.

Write the next action as a concrete question. “Confirm whether the quoted service includes the requested onsite workshop” is more useful than “check costs.” Identify the internal deadline and escalation route. Link the action to the section or pricing line it blocks so the owner understands why it matters.

Keep follow-up proportionate. A brief discussion with the right people may resolve several connected issues faster than repeated automated reminders. Tendi’s approach combines AI-assisted organisation with human ownership of these decisions. The process works when someone can identify the missing answer and route it to the person with authority to provide it.

Handle buyer clarifications and amendments carefully

When the buyer provides new information, identify every assumption it changes. Preserve the earlier source and connect the revised row to the formal answer or amendment. Do not overwrite the history so completely that the team cannot explain why the price or scope changed.

Use a tender clarification log to maintain the question and official response. Then assign updates to the pricing, delivery and writing owners. A clarification is not fully incorporated merely because someone has pasted it into the working folder.

Reconfirm approvals where the new information changes the basis of the offer. An earlier approval may have covered a different scope or timetable. Record the version reviewed after the change so the final authoriser can see the current decision rather than relying on an outdated sign-off.

Review the proposal and pricing together

Run a reconciliation meeting or focused review using the current files. Ask whether each material scope statement is reflected in the estimate and whether each important pricing condition is treated appropriately in the narrative. Check optional work, customer responsibilities and unresolved inputs explicitly.

Look at units and periods. A price described per month in one place should not appear as an annual amount elsewhere without explanation. Check that totals, labels and included quantities agree with the approved workbook. The person responsible for the calculations should verify them; the coordinator’s role is to ensure that verification happens against the submitted version.

Review the external assumptions schedule independently. Remove private comments and superseded positions. Confirm that the disclosure route follows the tender instructions. Where specialist interpretation or contractual approval is needed, obtain it through the organisation’s process rather than treating editorial review as sufficient.

Protect the commercial working record

The internal log may contain sensitive estimates, supplier quotations and negotiation notes. Keep it in the approved storage location and share it only with the people who need it. Use references in broader coordination documents instead of distributing the underlying commercial material unnecessarily.

Before submission, inspect attachments for hidden comments, tracked changes and internal worksheets as appropriate to the file type. Confirm that the exported version contains the intended information. A correct source file is not proof that the final PDF or workbook is suitable to send.

Retain the approved record with the offer through your normal process. If the buyer later requests a clarification, the team can return to the actual basis of the submitted proposal. Do not rely on memory or a new interpretation of what the earlier estimate probably meant.

Use AI to find inconsistencies, with human checking

AI can assist with comparing terminology, identifying broad scope phrases or creating a list of candidate inconsistencies between approved text excerpts. It can also infer conditions that do not exist or misread a table. Treat its output as a review prompt and verify it against the actual files.

Use only tools approved for the commercial information involved. Do not upload confidential pricing simply because a general-purpose assistant offers document comparison. Human owners remain responsible for the estimate, delivery commitments and release decision. A generated summary should never be treated as commercial approval.

Common questions about pricing assumptions logs

Should every internal assumption appear in the bid?

No. Follow the buyer’s instructions and the approved commercial position. Some internal planning notes are not intended for external disclosure. Other conditions may require a specific declaration or qualification. Have the responsible owner decide the treatment and review the submitted schedule separately.

Can an approved assumption remain unchanged after scope changes?

Only after the relevant owner has checked that it still applies. Link the row to the changed requirement and reopen the decision when necessary. An old approval does not automatically cover a new quantity, responsibility or timetable.

Who should approve the final price?

Use your organisation’s authority arrangements. The writer or coordinator should not assume authority because they assembled the files. A bid approval workflow helps connect the reviewed package with the person authorised to release it.

Make the offer easier to understand and hand over

Start by logging the few unresolved inputs that could materially change scope or delivery. Give each one a source, owner and decision date. Reconcile the price and narrative as those decisions are made, then review the final external files together.